Start with the information that changes the project.
Five steps
A clearer path from enquiry to project.
01
Choose your product
Tell us whether you are interested in a granny flat, tiny home or timber sauna.
02
Share the location
Provide the project location or postcode so site and delivery context can be considered.
03
Set budget and timing
An estimated budget and desired timeframe help keep the next conversation practical.
04
Review the site and fit
We discuss access, intended use and the design or model that best matches the project.
05
Confirm the path forward
Once the scope is clear, the project can move into detailed planning, build and delivery steps.
Build examples
See how the major construction stages come together.
Mother-company project example

Stanthorpe structural completion example
See the finished design: the Stanthorpe granny flat.
A Timber Garden Cabins Stanthorpe project example showing a two-bedroom structural stage. Woodland project details are confirmed for each site.
Mother-company project example

Two-bedroom foundation example
A mother-company project example showing the foundation stage before the structure progresses. Site conditions determine the final foundation approach.
Mother-company project example

Foundations to lock-up example
A Timber Garden Cabins build example covering major milestones from foundations and framing through exterior completion and lock-up.
Turnkey: what we handle
Woodland Living is a QBCC licensed building company. Our granny flats combine a European solid timber system with construction by Australian builders, delivered as a turnkey build. Using the Stanthorpe as an example, the build includes:
Approvals: building and plumbing approval with Council and certifiers, a full set of plans, soil test, foundation engineering, inspections and lodgements.
Structure: solid timber walls, Colorbond roof with insulation, and a foundation on concrete piers with steel posts.
Utility connections: connection to your existing power, sewer, fresh water and telecommunications, with a budget allocation of 20m of trenching.
Kitchen and bathroom: cabinetry, cooktop, oven and sink; walk-in shower, vanity, laundry and waterproofing to NCC.
Inclusions vary by design. Read more in our guides: how a granny flat build comes together and the granny flat site assessment checklist, or see the FAQ.
Ready to begin?
Start with a site assessment request.
You do not need every detail resolved before getting in touch.


